Air and Water Cooled Installation and User's Manual

Final Check List
After connections,
1 Wash out the bin. If desired, the interior of the
bin could be sanitized.
2 Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1 Is the unit located indoors in a controlled
environment?
2 Is the unit located where it can receive
adequate cooling air?
3 Has the correct electrical power been supplied
to the machine?
4 Have all the water supply connections been
made?
5 Have all the drain connections been made?
6 Has the unit been leveled?
7 Have all unpacking materials been removed?
8 Is the water pressure adequate?
9 Have the drain connections been checked for
leaks?
10 Has the bin interior been wiped clean or
sanitized?
11 Have any water filter cartridges been replaced?
12 Have all required kits and adapters been
properly installed?
November 2006
Page 13
C1448, C1848, C2148W
Air and Water Cooled User Manual