Install Instructions
2
The SharkBite
®
System
The SharkBite
®
connection system uses
an advanced push-t design that works
in two stages. When the tube is inserted
into the tting it passes the rst stage
through a release collar and then through a
stainless steel grab ring. The grab ring has
teeth that open out and grip onto the tube.
At the second stage the tube is pushed
through an o-ring protector which aligns the
tube. A specially formulated o-ring is then
compressed between the wall of the tting
and the tube before the end of the tube
reaches the tube stop.
Only when the tube has passed through
the o-ring and reaches the tube stop, is
a secure joint created. The SharkBite
®
ttings can only be used with pipe/tubing
certied to the following specications:
• PEX (ASTM F876, CSA B137.5)
• Copper (ASTM B 88)
• CPVC (ASTM D 2846, CSA B137.6)
The SharkBite
®
ttings have an integral
Tube Support Liner that is effective in
supporting PEX tubing to ensure the
o-ring seals correctly on the outside of the
PEX tubing. The Tube Support Liner is not
required for use with CPVC and copper
tubing; however these two types of tubing
t over the Tube Support Liner easily and
hold it against the tube stop. But the tube
liner may be easily removed based on
preference or local codes – see page 5
for details.
INSTALLATION
INSTRUCTIONS
SharkBite
®
Connection System
Grab Ring
Release Collar
Support Sleeve
O-Ring
Protector
O-Ring
First Stage
Second Stage