Service manual

5 – 6
8) Unscrew the 3 screws on the back side of the side cover R, and
remove the side cover R.
9) Unscrew the 3 screws on the side cover L, and remove the side
cover L.
10) Remove the connectors and reactor in the control box.
11) Remove the 2 screws fixed the control box.
12) Remove the 2 screws fixed the bulkhead plate.
13) Remove the compressor covers 1, 2, 3,4 and 5.
14) Remove the nut, and remove the terminal cover.
5
AY-ZP35PR