Service manual

AYAP7FHR
6 – 2
8) Release 3 hooks out from cabinet.
9) Take down the front panel.
10)Remove 2 screws fixing the earth wire.
11)Remove a screw fixing the control box cover.
12)Remove the control box cover.
13)Cut the band and take out the sensor from sensor holder.
14)Cut the 2 bands fixing the wires.
15)Remove 4 connectors.(CN1-CN4)