Operating instructions

E-21
ENGLISH
780
840
890*
950
950
890
840
680
Dimension of ceiling opening and location of the hoisting screw (M10)
NOTE:
The drilling of holes in the ceiling must be done by the professional personnel.
The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm.
606
650
600 - 610
650
66
600-610
400
160 mm
(Decorated surfaceboards)
(Ceiling opening)
(Indoor unit)
(Gaps between hoisting screw rods)
(Gaps between hoisting screw rods)
(Indoor unit)
(Ceiling opening)
Hoisting screw (X4)
Refrigerant pipe
(Decorated surface boards)
Ceiling
Above 20 mm
Length unit: mm
GX-X18JR
GX-X24JR/GX-X36JR
(Hanging bolt position)
(Hanging bolt position)
(Grille measurement)
Installation stands formain body of the unit
(Grille measurement)
(Ceiling opening)
(Ceiling opening)
GREE_cassette_eng.indd 21 08.10.28 11:42:45 AM