Operating instructions

E-22
Install the air conditioner
1 Attach the articulation on the lifting bolt with the two nuts and washers.
• Use the washer xed board to prevent washer from falling.
2 Use the model paper.
Refer to the model paper about the dimension of ceiling opening.
The central mark of the ceiling opening is marked on the install cardboard.
Install the install cardboard on the unit by screws (4 piece).
3 Adjust the unit to the suitable install place.
4 Check if the unit is horizontal.
Inner drainage pump andoat switch are included in the indoor unit, check if 4 angle of every
unit are horizontal by water level. (If the unit is slant toward the opposite of the water ow,
there may be malfunction of the oat switch and lead water drop.)
5 Remove the washer xed board and tighten the nut on it.
6 Remove the model paper.
Nut (local parts)
Washer (attachment)
Articulation
Tighten (double nuts)
Washer fixed board
(attachment)
Water level
Polyethylene tube
Center of the ceiling opening
Screw (attachment)
Model paper(attachment)
Screw (attachment)
Insert
INSTALLATION INSTRUCTIONS
GREE_cassette_eng.indd 22 08.10.28 11:42:45 AM