Operating instructions

E-26
5~8mm
Installation of panel
GX-X24JR/GX-X36JR:AZ-24J
Fit the swing ap motor position of the panel to the piping position of the indoor unit.
1. Hang the latch, which is located on the opposite side of the swing ap motor on the panel, to the
hook of the indoor unit. (2 Positions)
2. Hang the remaining 2 latches to the hooks on the sides of the indoor unit. (Be careful not to get
the swing motor lead wire caught in the sealing material.)
3. Screw all 4 hexagon head screws located right beneath the latches in approximately 15mm. (The
panel will rise)
4. Adjust the panel by turning it to the arrowed direction in gure so that the ceiling opening is
completely covered.
5. Tighten the screws until the thickness of the sealing material between the panel and the indoor
unit is reduced to 5~8mm.
GX-X18JR:AZ-18J
1. Unscrew the 2 screws.
2. Slide the 2 stoppers and remove the front grill.
3. Attach the panel on the indoor unit with the 4 hexagon bolts securely.
4. Replace the front grill and tighten the 2 screws removed in step 1.
5~8mm
Hook
Latch
Piping position
Swing ap moter
Indoor unit
Ceiling
Air outlet Panel
Sealing material
INSTALLATION INSTRUCTIONS
GREE_cassette_eng.indd 26 08.10.28 11:42:46 AM