RESU 3.3, 6.5, 10, RESU Plus
Table Of Contents
- Contents
- 1 Safety
- 2 Product Introduction
- 3 Installation Prerequisites
- 4 Battery Pack Installation
- 5 RESU Plus Installation
- 6 Configuration Switches
- 7 Commissioning
- 8 Troubleshooting
- 9 Firmware Update
- 10 Warranty
- 11 Certifications
- A Compatible Inverters
- B Supported Memory Cards
Installation Prerequisites
operate is 15°C to 30°C. Frequent exposure to harsh temperatures may deteriorate
the performance and lifetime of the battery pack.
3.3 Tools
These tools are required to install the battery pack.
Torque screwdriver Phillips-screwdriver bit Hex-key bit
Phillips-head screwdriver Flat-head screwdriver Torque wrench
Wire stripper Cable crimper Voltmeter
Tape measure Drill Sealant gun
Use properly insulated tools to prevent accidental electric shock or short circuits. Use
adjustable tools and measuring instruments that are certied for precision and accu-
racy.
17