Specifications

- To install -
1. Set the rear bearing [A] on the rear frame.
2. Insert the rear end of the hot roller shaft through the rear bearing.
3. Place gear [B] on the rear end of the shaft.
4. Install the bearing stopper [C].
5. Set the rear side C-ring [D] on the rear shaft.
NOTE: a) Peel off 3 cm (1 inch) from both ends of the protective sheet
before installing a new hot roller.
b) Before setting the pressure springs, remove the rest of the
protective sheet.
c) Before reinstalling the pressure springs, refer to the installation
procedure in the Pressure Roller Replacement Section.
[D]
[B]
[A]
[C]
1 December 1990
5-84