User's Manual

Automation and Drives - SCE
T I A Training Document Page 24 of 25 Module
5. TESTING THE STEP 7 PROGRAM
The STEP 7 program to be tested can now be loaded into the PLC.
In our case, this is only OB1.
18. Save the organization block with
and load it into the PLC by clicking on . When this is
being done, the key switch on the CPU should be in the STOP position! (
)
Foreword Notes Hardware configuration STEP 7 program Testing
A5
Issue date: 02/2008 Programming the CPU 314C-2DP