Instructions / Assembly

9
5. Anchor your rail with screws and E-Z Toggles:
a. Position rail into the correct location. Make sure the bottom of the rail
lines up with the hang line and screw into the wall stud that's nearest to the
center of the rail.
b. Level the rail and mark a line along the bottom edge.
c. Determine where E-Z Toggles may be needed
E-Z Toggles are required whenever
a vertical panel is more than 3" from a wood stud or
a rail end does not coincide with a wood stud location.
Mark the E-Z Toggle locations by holding the rail with the bottom edge on
the rail height line on the wall. Mark the wall through the rail holes where E-Z
Toggles are required.
Rotate the rail out of position, then install E-Z Toggle anchors as shown in the
nearby illustrations.
Rotate the rail back into position. Bolt the rail to the wall using the toggle
screws. Ensure the raiL is level when attaching it to the wall.
TIP: Examine a Toggle closely and push a screw into it to understand how
it functions.
IMPORTANT: Never use substitutes for our Toggles! Plastic anchors or
“Molly Bolts” will not work!
d. Drive black rail screws into available studs at all locations. We
recommend two screws per stud where possible. Angle screws if necessary.
IMPORTANT: Do not use substitute toggle hardware!
IMPORTANT: Toggles only work with ½" and
5
8" thick drywall.
x x
Install E-Z Toggle anchor.
Install E-Z Toggle screw.
Install rail screws.
We recommend two screws
per stud, where possible.
Add E-Z Toggles between
studs, where required.
Shim rail, if necessary.
Add E-Z Toggles when rail
does not end at a stud
Wavy wall
Add shims behind rail to
ensure it is straight.
E-Z Toggles at 2" & 5" from rail end
Top View
INSTALL RAIL FOR HANGING VERTICAL PANELS
Mount
IMPORTANT: Failure to shim the rail on a wavy wall
will cause the vertical panel notches to break!
IMPORTANT: Do not install rail cover at this time! The
rail cover will be installed after vertical panels are hung.
If a vertical panel is more than
3" from the nearest stud, add
an E-Z Toggle close to but not
under vertical panel.
TAP
Drive anchor into drywall until

surface or slightly countersunk,
and arrows point up and down.
Tap screw to deploy clamp. Turn screw
20-25 complete revolutions to tighten.
Do not over-tighten or the drywall will be
weakened.
E-Z Toggle
location options
Vertical panel
Metal studs? If you indicated that you have metal studs, we would have provided only E-Z Toggles. Avoiding
the metal studs, install E-Z Toggles every 6"-8" and two at each rail end as shown nearby.
Masonry Walls?

masonry screws every 6"-8" and two at each rail end.
6. Make sure the rail is straight: It is important to ensure that the rail is straight.
The rail must conform to our shelving system and not to an imperfect wall.
Use a long straight edge, such as a 4 foot level or a vertical panel, to locate any
hollows or bulges in the wall.
Wherever the wall hollows, loosen the rail screws, insert shims between
the rail and the wall and retighten the rail screws. Shims may be any solid,
thin material. Another sign indicating that shimming is necessary is if you

later in the installation.