Installation Instructions

Step 3: Installing Fence Brackets
If posts are to be installed in level ground attaching brackets in advance
of post installation is easiest when using a measuring template for
faster repetitive bracket installation. It is easier to change a bracket in
the eld if necessary than to install brackets once posts are installed in
the ground.
Installed brackets provide a leveling point on each post.
DISTANCE FROM TOP OF POST TO SUPPORT BRACKET SURFACE
Note: Brackets come packaged at the tip
of the post during shipping. They must be
removed and reattached in the channel of the
post at the desired height during installation.
Step 4: Post Spacing & Concrete Footings
3' High EcoStone Panel
- Dig a hole 10"-to-12" in diameter
- Holes should be 24" deep for 3ft and
4ft panels and 36" deep fot 6ft panel.
However, please consult your local
building codes
- Use one and a half or two 80 lbs ready
mix bags of concrete
- For a 3' installation, the bottom of
the post should be cut leaving a
56"-62" post (38" above ground
and 24" below ground)
- Cut the bottom of the post.
NEVER cut the top of the post
Panel Size 3' 4' 6' 8'
Bracket
Location
38" 50" 74" 98"
4
Tip
Tip