Installation Guide

Step 3: Installing Fence Brackets
If posts are to be installed in level ground attaching brackets in advance
of post installation is easiest when using a measuring template for
faster repetitive bracket installation. It is easier to change a bracket in
the eld if necessary than to install brackets once posts are installed in
the ground.
Installed brackets provide a leveling point on each post.
DISTANCE FROM TOP OF POST TO SUPPORT BRACKET SURFACE
Tip
Note: Brackets come packaged at the tip of the
post during shipping. They must be removed and
reattached in the channel of the post at the desired
height during installation.
Step 4: Post Spacing & Concrete Footings
3’ High EcoStone Panel
Tools Needed
- Dig a hole 10”-to-12” in diameter
- Holes should be 24” deep for 3ft and 4ft
panels and 36” deep fot 6ft panel. However,
please consult your local building codes
- Use one and a half or two 80 lbs ready mix
bags of concrete
- For a 3’ installation, the bottom
of the post should be cut leaving
a 56”-62” post (38” above ground
and 24” below ground)
- Cut the bottom of the post.
NEVER cut the top of the post
Tip
10”-12”
Hole Diameter
Panel Size 3’ 4’ 6’ 8’
Bracket
Location
37.5” 49.5” 73.5” 98”