Installation Guide
Bathtubs:Rough-InWasteDrain
The copper bathtub rough-in kit not only makes installation easier,
butitsavestimeandmoney.Designedtoworkspecicallywith
Sinkology copper bathtubs, and is protected by a lifetime warranty.
1. Final waste drain and waterline rough-in’s should be completed
andooringshouldbenished.Ensurebathtubisproperly
supported and level.
2. Double check bathtub faucet installation requirements before
nalbathtubinstallation.
3. Apply thread sealant or plumbers tape to any threaded
connections that do not have rubber gaskets.
4. Applyplumbersputtytoundersideofdrainangeandthread
through the bathtub and into drain pipe.
5. Ensurewastedrainandoverowissecurelyconnectedto
bathtub.
6. Place tub back into desired location and verify that bathtub is
level. If using recommended rough-in kit (#ITD35), the tub will
needtobeliftedapproximately8”beforeloweringintonal
position.
7. Finish installation by running a bead of silicone adhesive
around the base of copper freestanding bathtub where
applicable to create a watertight seal.
8. Allow sealants and adhesive to thoroughly dry before
llingbathtubwithwater.Consultsealantandadhesive
manufacturers for dry times, as they may vary.
9. Register your new bathtub at sinkology.com/registration.
Important
Sinkology copper bathtubs are handmade so variations in dimensions can
occur.WerecommendperformingRough-Inprocedureswiththebathtub
on site to ensure the correct installation.
21
PRO
DIY