Owner Manual

If the Enclosure net and Jumping mat are pre-installed,
follow below steps to assemble the Jumping mat to frame.
5.1 Inspect the connection of Jumping mat and Enclosure
net, make sure all the V-rings are passed through the
corresponding net holes.
5.2 Place the Jumping mat(3) on clear ground inside the
frame. and then adjust the location of two warning
dacals to align the two T-joint in opposite direction
as shown.
the first V-ring
the first hole
5.3 Attach the first V-ring with a spring to the first spring
hole on left side of T-joint, and then attach the opposite
V-ring to the first spring hole on left side of T-joint.
NOTE:
Count exactly the quantity of V-rings and the spring holes
on frame top, make sure each of them are corresponding.
5.
the first spring hole
T-joint
left side
5
18
3
enclosure door
T-joint
Warning
Decal
Warning
Decal
T-joint
Enclosure
door
the first spring