Technical Information SUNNY BOY STORAGE Approved Batteries and Information on Battery Communication Connection WER Y TRIPO SUNN ENGLISH SBS-Batterys-TI-en-11 | Version 1.
Table of Contents SMA Table of Contents 1 Approved Batteries .................................................................. 3 2 Battery Communication Connection ....................................... 5 2.1 5 5 5 6 6 2.2 2 Cable Requirements................................................................................................... 2.1.1 SBS2.5-1VL-10 / SBS3.7-10 / SBS5.0-10 / SBS6.0-10.................... 2.1.2 SBS3.8-US-10 / SBS5.0-US-10 / SBS6.0-US-10 ..............................
1 Approved Batteries SMA 1 Approved Batteries In these tables, you find the batteries that are approved for the operation with the following battery inverters of SMA (status: 05/2018): • SBS2.5-1VL-10 (Sunny Boy Storage 2.5) • SBS3.7-10 (Sunny Boy Storage 3.7) • SBS5.0-10 (Sunny Boy Storage 5.0) • SBS6.0-10 (Sunny Boy Storage 6.0) • SBS3.8-US-10 (Sunny Boy Storage 3.8-US) • SBS5.0-US-10 (Sunny Boy Storage 5.0-US) • SBS6.0-US-10 (Sunny Boy Storage 6.
1 Approved Batteries SMA Synchronizing the battery and battery inverter All batteries mentioned supply a defined nominal current. Please pay attention to the battery manufacturer's recommendation regarding the suitable dimensioning of the battery in order to achieve the nominal and overload currents of the systems stated in the datasheet with a Sunny Boy Storage.
2 Battery Communication Connection SMA 2 Battery Communication Connection 2.1 2.1.1 ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ Cable Requirements SBS2.5-1VL-10 / SBS3.7-10 / SBS5.0-10 / SBS6.0-10 Twisted pair conductors Cable category: minimum CAT5e Shielding: yes Conductor cross-section: 0.25 mm² to 0.34 mm² (24 AWG to 16 AWG) Recommended number of conductor pairs: 4 External diameter: 6 mm to 8 mm (0.24 in to 0.3 in) Maximum cable length: 10 m (33 ft) The cable has to be insulated for 600 V. UV-resistant for outdoor use.
2 Battery Communication Connection 2.2 SMA Cabling Plan 2.2.1 SBS2.
2 Battery Communication Connection SMA Sunny Boy Storage (SBS2.
2 Battery Communication Connection 2.2.2 SMA SBS3.7-10 / SBS5.0-10 / SBS6.0-10 / SBS3.8-US-10 / SBS5.0-US-10 / SBS6.
2 Battery Communication Connection SMA Sunny Boy Storage (SBS3.7-10 / SBS5.0-10 / SBS6.0-10 / SBS3.8-US-10 / SBS5.0-US-10 / SBS6.
www.SMA-Solar.