Use and Care Manual
12
30SB, 36SB, 45SB
Rev Nov2014
Snow BEAST
Assembly Instrucons
Step 7: Auger and Transmission Control Cables
Control cables are preset at the factory, but may require addional adjustment for opmal operaon. Control
cables require periodic inspecon and maintenance to maintain opmal performance.
1. Locate the black cable on the right side (standing from the operator posion) of the snow blower. Ensure the
cable is properly seated in the plasc guide pulley at the rear of the chassis.
2. Aach the cable to the threaded end under the drive control handle. The cable adjustment tube with Z rod may
need to be aached to the boom of the handle.
3. Screw clockwise to secure unl all threads are engaged in the adjustment tube. Tighten lock nuts when correct
tension is achieved.
4. The drive and impeller cables will be at correct tension when the cables are properly aached to the handles
and the cable has a 1 inch deecon to either side when pushed with a nger as shown.
Repeat the same process for the Auger/Impeller engagement cable on the le side of the snow blower.
Correct amount of
deecon shown
Need Help With Assembly?
(919)-550-3221
Transmission
Control Cable
Auger/Impeller
Control Cable