Use and Care Manual

12
30SB, 36SB, 45SB
Rev Nov2014
Snow BEAST
Assembly Instrucons
Step 7: Auger and Transmission Control Cables
Control cables are preset at the factory, but may require addional adjustment for opmal operaon. Control
cables require periodic inspecon and maintenance to maintain opmal performance.
1. Locate the black cable on the right side (standing from the operator posion) of the snow blower. Ensure the
cable is properly seated in the plasc guide pulley at the rear of the chassis.
2. Aach the cable to the threaded end under the drive control handle. The cable adjustment tube with Z rod may
need to be aached to the boom of the handle.
3. Screw clockwise to secure unl all threads are engaged in the adjustment tube. Tighten lock nuts when correct
tension is achieved.
4. The drive and impeller cables will be at correct tension when the cables are properly aached to the handles
and the cable has a 1 inch deecon to either side when pushed with a nger as shown.
Repeat the same process for the Auger/Impeller engagement cable on the le side of the snow blower.
Correct amount of
deecon shown
Need Help With Assembly?
(919)-550-3221
Transmission
Control Cable
Auger/Impeller
Control Cable