User Manual Energy Storage System MODEL : IJ1001SNBT Sony Energy Devices Corporation 2012.4 Rev.
Energy Storage System “IJ1001SNBT” FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.
Energy Storage System “IJ1001SNBT” Table of Contents Important Safety Information Read the first Safety instructions The Energy Storage Sysytem How the system works The system structure The Energy Storage System Installation Parts Included Other Parts and Tools Required Install procedure On site software update (if necessary) Commissioning The Energy Storage System Activation Connecting to the Internet. Activating Energy Storage System for Field Trial.
Energy Storage System “IJ1001SNBT” Important Information Read the first SAVE THESE INSTRUCTIONS– This manual contains important instructions for Model(s) IJ1001SNBT that shall be followed during installation and maintenance of the system. To reduce the risk of electrical shock, and to ensure the safe installation and operation of the Energy storage system, the following safety symbols appear throughout this document to indicate dangerous condition and important safety instructions.
Energy Storage System “IJ1001SNBT” The Energy storage system The Energy storage system is the world’s most technologically advanced energy storage system for utility-interactive applications. This manual details the safe installation and operation of the energy storage system.
Energy Storage System “IJ1001SNBT” The Energy Storage System How the system Works This Energy storage system charges the integrated lithium ion battery from electrical utility grid through the distribution panel automatically when the battery’s capacity is not full and its charging period is controlled by the home energy management system(HEMS) which is specially by Sony Corporation.
Energy Storage System “IJ1001SNBT” The Energy Storage System Installation Follow the instructions in this section to install the energy storage system. CAUTION : Before installing the energy storage system, read all instructions and cautionary markings in the installation manual. CAUTION : Perform all electrical installations in accordance with all local electrical codes and the National Electrical Code(NFC), ANSI/NFPA 70.
Energy Storage System “IJ1001SNBT” Other Parts and Tools Required In addition to the energy storage system and its associated hardware, you will need to provide the followings. The rating of the parts described on Page 50 to 54.
Energy Storage System “IJ1001SNBT” Other Parts and Tools Required ① ①Screw Driver(+) Φ6㎜(#2) ② ②Screw Driver(+)Φ5㎜(#1) ④ ⑤ ③Stabi.
Energy Storage System “IJ1001SNBT” Installation Procedure Installing the energy storage system involves several key steps : 1, Open the cargo and Take out the energy storage server from outer enclosure. 2, Open the energy storage server using screw driver and install the lithium ion battery module. 3, Set the outer enclosure to the wall 4, Install the energy storage server into the outer enclosure. 5, Assemble the WiFi antenna to the outer enclosure.
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Description Energy Storage System Inverter Energy Storage Server Outer Enclosure Copyright Sony Energy Devices Corporation 11
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the front door(Optional) Front door Tool ⑨ refer to Page 9 Copyright Sony Energy Devices Corporation 12
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the belt. It won’t be used. Can be disposed.
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the jig-3. Jig-3 The screw removed won’t be used. It can be disposed.
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the jig-4,5. Jig-4 Jig-5 The screw removed won’t be used. It can be disposed.
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the front panel of the energy storage server.
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the cables bellow.
Energy Storage System “IJ1001SNBT” Open the cargo and Take out the energy storage server from outer enclosure Remove the wire from ground terminal on the rear panel of energy storage server.