Instructions / Assembly

Flexible Duct Connection
(Non-Metallic)
Cut completely through duct and wire
Fold back vapor barrier and insulation
Apply mastic uniformly to the outside
surface of collar
Slide 1” of core over collar and past the
bead
Secure connection with clamp placed
over the core and past the bead
Pull vapor barrier and insulation back
over the core and fitting
Tape barrier with 2 wraps of duct tape
Using mastic and fasteners to make connection