Installation Manual

© 2006 Schneider Electric USA All Rights Reserved
31169-601-01 Square D
®
Intelligent Load Center
10/2006 Installing the Cover
7
ENGLISH
2. Attach the Spanish translation label, if supplied with the load
center, to the rear of the cover. See Figure 7.
3. Identify the branch circuits on the directory label.
4. If the load center is used as service equipment, apply the “Service
Disconnect” label to the part of the cover nearest the main circuit
breaker handle. If the load center is not used as service
equipment, apply the “Main” label to the part of the cover nearest
the main circuit breaker handle.
5. Install the cover using the screws provided.
Energizing the Load Center
1. Before energizing the load center, turn off the main and all branch
circuit breakers.
2. After power is turned on to the load center, first turn on the main
circuit breaker and then turn on the branch circuit breakers.
Figure 6: Removing the Twistouts
Figure 7: Label Locations
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
QO
Spanish
label
Main or service
disconnect label
(if required)
Cover
directory
label