Installation Instructions

9
contact fashion. All membrane-to-membrane seam applications
require RoofKit Seam Primer and 5" Cover Strip to be installed
over the entirety of the seam.
PIPE PENETRATIONS
When laying out the eld membrane and a pipe is encountered,
roll the folded membrane to the pipe. Be sure to maintain the
proper alignment of the membrane with the roof edge, wall, and
seams. Make a straight cut from the pipe to the nearest edge of
the eld seam (see Figure 5). Cut a hole to match the diameter
of the pipe and roll the membrane around the pipe. Check the
nal position of the membrane. Fold the membrane back and
begin the adhesive application.
PROTRUSION IN THE ROOF
1. When laying out the eld membrane and a curb (chimney,
skylight, etc.) is encountered, unroll the folded membrane
up to the curb while maintaining proper sheet alignment
with walls, perimeter edges and other protrusions.
2. Measure the height of the curb from the center of the curb
base to the top of the curb. Transfer the corresponding
dimensions onto the folded membrane and mark the
membrane. Cut the membrane in a straight line from the
nearest edge to the mark. Then angle cut the membrane
from the mark to each corner of the curb detail. NOTE: this
should be a 45º cut. See Figure 6, next page.