Installation Instructions

21
Where a Cover Strip Travels Under
a Pipe Boot or Other Flashing.
IMPORTANT: ONLY TAPE FLASHING IS USED FOR
T-JOINT PATCHES. ALL T-JOINT PATCHES SHOULD
BE THOROUGHLY ROLLED WITH A STEEL OR HARD
RUBBER ROLLER.
METAL EDGE DETAIL
Fully adhere the membrane to the roof edge. Allow the
membrane to wrap completely over the edge of the roof a
minimum of three inches (3").
Install the metal edge using 3/4" minimum roof nails every 4"
to 6" on center.
COVER STRIP ON
METAL EDGE DETAIL
Using Seam Primer, clean the metal and the membrane to
be covered. Using a scrub pad, apply the primer to the metal
and eld membrane using back and forth motions the entire
length of the metal edge. To ensure 100% adhesion, always
apply the primer to an area that is wider than the Cover Strip.
After the Seam Primer has ashed off, install the Cover Strip
approximately one-half inch (1/2") in from the outside edge of
the metal edge. Roll the entire Cover Strip with a steel or hard
rubber roller. (shown in Figure 18, next page).
Clean all Cover Strip edges with Seam Primer and apply a one-
quarter inch (1/4") bead of Rubber Caulk to those edges.