Installation Instructions

27
T-JOINT: An area formed when two layers of RoofKit Rubber
Roong Membrane form a seam that travels under, or over, a
third layer. The center of the “T" is where the middle layers end
and the top layer bridges over the middle layers.
TAPE FLASHING: Uncured EPDM membrane with
adhesive tape that is used whenever the eld sheet has to be
cut to accommodate outside corners, pipes, T-Joint patches and
eld seams making angle changes. After the Tape Flashing is
applied, it will cure in the position in which it was applied.
Seam Primer must be used in the membrane area where the
Tape Flashing is applied.
WATERSTOP: Used to create a waterproof compression
gasket whenever the RoofKit Rubber Roong Membrane is
mechanically fastened using a Termination Bar or Pipe Boot
Steel Clamp. Water Stop is applied between the membrane and
the pipe or wall. The mechanical termination is installed over
the membrane, compressing the Water Stop and creating the
gasket. Also used for all gasket seals at drain clamping rings.