Installation Instructions

8
membrane. Caution: limit foot trafc on the membrane while
adhesive is curing. The sheet offers less resistance until the
adhesive is completely cured. Repositioning of the membrane is
possible while the adhesive is still wet. After the adhesive begins
to set-up (approximately 20 to 35 minutes) apply pressure with
a push broom to ensure good contact. This application requires
a porous substrate, such as High Density Fiberboard.
Fold back the remaining unglued portion of membrane and
repeat this process.
If installing more than one roll, always install the membrane
so that the ow of water goes over and not against the lapped
edges. Allow the next roll of membrane to over lap the previous
roll of membrane a minimum of four inches (4"). Again, fold
the membrane onto itself so that one-half (1/2) of the underside
of the membrane is exposed. Apply Latex Bonding Adhesive to
the substrate and proceed as you did with the rst roll.
Multi-Purpose Adhesive
The Multi-Purpose Bonding Adhesive can be used for any
application on the roof: adhering the membrane to a substrate
or membrane-to-membrane seaming. This adhesive must be
applied to both the membrane and the substrate in a thin coat
using a solvent approved roller. Allow the adhesive to dry
(tacky), then bring the membrane and substrate together in a
4
Fig 3
Bonding
Adhesive