User manual

4.6 Connecting the inverter and switching on the AC power
DANGER!
Risk of death by electrocution! Observe the warning notes in
Ä 4.1, p. 102
.
ATTENTION!
Maintain a minimum clearance of 200 mm between the data connection cables (RS485/
Ethernet) and the DC-/AC cables to prevent data transmission interference.
IP65 protection for type coolcept-x is only guaranteed when the AC and DC plugs are inserted
and the open RJ45 sockets are closed with sealing caps.
1. If necessary, establish a data connection:
n Connect the inverter and master using the data connection cable.
n Switch on the termination (slide switch) at the last inverter.
2. Close any open RJ45 sockets with sealing caps.
3. Push the opposing connector (DC cable) firmly into the DC connection of the inverter until it
audibly clicks into place.
4. Insert the AC plug into the socket on the inverter until it audibly clicks into place.
5. Switch on the AC line circuit breaker. The start page for initial commissioning is shown on
the display.
6.
Perform initial commissioning and switch on the DC supply, as described in
Ä 4.7, p. 108
and
Ä 4.8, p. 112
.
4.7 Initial commissioning of the inverter
4.7.1 Function
Conditions for starting initial commissioning
Initial commissioning starts automatically when at least the AC connector has been installed and
switched on as described previously. If initial commissioning is not fully completed then it starts
again anew the next time the device is switched on.
Guided initial commissioning
Initial commissioning is a guided procedure that sets the following information:
n Display language
n Date / Time
n Country
n Reactive power characteristic curve (if prescribed for the selected country)
Setting the country
The following applies when setting the country:
GB
747.431 | Z08 | 2014-01-31
108