user manual

”Drying” Blower
Re move the pro tec tive grid of the blower (pos. 7).
Loosen the nut (pos. 10).
Loosen the screw (pos. 11).
Re place ment: Re move de fec tive V-belts (pos. 32), put on new ones.
Re-tensioning: Ad just belt ten sion by means of screw (pos. 11) in ac cor dance with the in for ma -
tion plate.
Tighten the nut (pos. 10) again.
Mount the pro tec tive grid of the blower (pos. 7).
Mount the side pan els.
F
At ten tion should be given to ex act align ment of the V-belt pul leys.
036-2MS
STT 1600
Main ten an ce 5- 9