Installation Guide

54
HARDWARE CONTENTS (shown actual size)
PREPARATION
SAFETY INFORMATION
WARNING
CAUTION
Please read and understand this entire manual before attempting to assemble, operate or install
the product.
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Assembly Time: 120 minutes
Tools Required for Assembly (not included): Phillips Screwdriver, Hacksaw, Miterbox,
100% Silicone Sealant, Level, Drill, 5/16 in. and 1/16” Drill Bit, Metal File, Tape, Tinsnips, Vacuum
and Pencil.








AA
BB
CC
DD
EE
Anchor Screw
Qty. 6
Wall Anchor
Qty. 6
Screw Cap
Cover
Qty. 6
Side Bumper
Qty. 6
Glass Hanger Bracket
Qty. 4
FF
Glass Guide
Qty. 3
GG
Glass Guide
Screw
Qty. 6
Lowes.comLowes.com
HH
Set Screw
Qty. 2
II
Set Screw Cap
Qty. 2