Installation Guide

4. Place the vertical side track (B) against the wall,
making sure to align the notch cutout on one end of
the vertical side track (B) with the shape of the
bottom track (A). Mark the position, then cut the
vertical side track (B) with tinsnips (not included)


NOTE: The bottom track (A) and vertical side

top ledge and the wall.
6 7
INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS
1. Measure distance “a” from wall to wall along the
top front ledge of the tub. Subtract 1/4 in. from the
measured distance and mark correct spot on the
bottom track (A). Cut along the mark with a
hacksaw and miterbox (not included).
2. Place bottom track (A) along top front ledge of


3. With bottom track (A) centered on the top front

temporarily secure. Once secured, mark the
position with a pencil (not included) along the
inside edge of bottom track (A).

vertical side tracks (B) are plumb. Once level, mark
the locations of the three holes with a pencil. Note:
You can use tape to temporarily secure the vertical
side tracks (B).
1
4
2 5
3 6
A
A
Lowes.comLowes.com
“a” markcut mark
1/4 in.
6. Remove and set the vertical side tracks (B)

holes in marked locations. Note: Make sure to use
the correct type of bit for the mounting surface.
Insert wall anchor (AA) into drilled holes.
Hardware Used
Wall anchor
x 6
AA
AA
A
A
A
B
B
a
a
B
A
A