Installation Guide

8 9
Hardware Used
8. Apply 100% silicone sealant (not included) in
the groove on the underside of the bottom track
(A). Align and secure the bottom track (A) to the top
front ledge of the tub along the marked locations.

silicone dries.
9. Install the side bumpers (BB) into the vertical
side tracks (B) using the anchor screws (CC). Attach
screw cap covers (DD) over the anchor screws (CC).
7. Remove bottom track (A) and tape from the top

included) to remove any debris and wipe the area
with a soft, damp cloth. Note: Make sure not to
erase the pencil marks.
7 10
8 11
9
Side bumpers
x 6
A
BB
BB
CC
DD
CC
DD
Anchor screws
Screw cap covers
x 6
x 6
B
Lowes.comLowes.com
12
INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS
10. Measure distance “b” from wall to wall at the
top of the vertical side tracks (B). Subtract 1/32 in.
from the measured distance and mark correct spot
on top track (C). Cut along the mark with a

(not included) to remove any sharp edges, making

B
B
C
b
b
cut line
“b” mark
1/32 in.
11.
Position the top track (C) over the vertical side
tracks (B).

curely on top of the vertical side tracks (B).
Note: Either side of the top track (C) can face
outward.
C
B
B
12. Remove the preassembled screws from the
glass hanger bracket (EE). Save the hardware (in-
cluding the plastic bushings
released) for future steps.
Hardware Used
EE
Glass hanger bracket
x 2
EE

SCREWS
A