User guide

41
GB
Mise en route / Start-up / Inbetriebsetzung
1
3
1
1
Select the EPAN menu
2
2
Check that: • the fertiliser selection is correct,
• hydraulic shutters are closed.
3
3
Select et execute the fixed station trial.
4
4
Select the dose/ha: use the numeric pad directly, validate by .
5
5
You are spreading in DPA mode.
-
You can modulate the dose/ha: select or and return to baseline flow rate by selecting .
6
6
You can modulate either the right-hand side by selecting , or the left-hand side by selecting
.
7
7
You can activate the Tribord 3D.
1
1
Select the REG menu.
2
2
Make sure that all parameters are correctly entered and saved : rate coefficient and working width .
3
3
Select your fertilisers
.
1
1
Select the INFO menu.
2
2
Select the mode.
3
3
Reset each counter to zero with the RAZ or RESET function.
4
4
Upon hearing the first sound alarm and watching a bell appearing on the screen, select to know the cause(s).
-
Select OK to return to the baseline menu.
5
5
Select
if you want to save your work.
A
B
C