User guide
41
GB
Mise en route / Start-up / Inbetriebsetzung
1
3
•
1
1
• Select the EPAN menu
•
2
2
• Check that: • the fertiliser selection is correct,
• hydraulic shutters are closed.
•
3
3
• Select et execute the fixed station trial.
•
4
4
• Select the dose/ha: use the numeric pad directly, validate by .
•
5
5
• You are spreading in DPA mode.
-
You can modulate the dose/ha: select or and return to baseline flow rate by selecting .
•
6
6
• You can modulate either the right-hand side by selecting , or the left-hand side by selecting
.
•
7
7
• You can activate the Tribord 3D.
•
1
1
• Select the REG menu.
•
2
2
• Make sure that all parameters are correctly entered and saved : rate coefficient and working width .
•
3
3
• Select your fertilisers
.
•
1
1
• Select the INFO menu.
•
2
2
• Select the mode.
•
3
3
• Reset each counter to zero with the RAZ or RESET function.
•
4
4
• Upon hearing the first sound alarm and watching a bell appearing on the screen, select to know the cause(s).
-
Select OK to return to the baseline menu.
•
5
5
• Select
if you want to save your work.
A
B
C