ADJUSTMENT
The hot gas by-pass valve is adjusted during the manufacturing testing phase.
As a rule no adjustment is required; anyway if it is necessary the operation
must be carried out by an experienced refrigerating engineer.
WARNING
the use of ¼” Schrader service valves must be justified by a real malfunction of
the refrigerating system. Each time a pressure gauge is connected, a part of
refrigerant is exhausted.
Without compressed air flow through the dryer, rotate the adjusting screw
(position A on the drawing) until the following value is reached:
Hot gas setting :
R134.a pressure 29.0 psig (+ 1.45 / -0 psi) [2.0 barg (+0.1 / -0 bar)]
R407C pressure 65.3 psig (+1.45 / -0 psi) [4.5 barg (+0.1 / -0 bar)]
A
4 mm
5/32 in.
+
-
VLY0001