The method below should be applied during the first start-up, after longer downtimes or subsequent to
maintenance works.
The start-up must be carried out by certified skilled personnel.
Processing sequence (see Section 11.1 "Control panel")
Ensure that all the steps of the “Installation” chapter have been observed.
Ensure that the connection to the compressed air system is correct and that the piping is suitably fixed and
supported.
Ensure that the condensate drain pipe is properly fastened and connected to a collection system or container.
Ensure that the by-pass system (if installed) is open and the dryer is isolated
Ensure that the manual valve of the condensate drain circuit is open.
Remove any packaging and other material which could obstruct the area around the dryer.
Activate the mains switch.
Turn on the main switch - pos. 1 on the control panel.
Ensure that the electronic instrument DMC14 is ON.
Ensure the consumption matches with the values of the data plate.
Ensure the fan work properly - wait for its first interventions (Air-Cooled).
Allow the dryer temperature to stabilise at the pre-set value.
Slowly open the air inlet valve.
Slowly open the air outlet valve.
Slowly close the central by-pass valve of the system (if installed).
Check the piping for air leakage.
Ensure the drain is regularly cycling - wait for its first interventions.