StorageTek Installation Manual
Table Of Contents
- Summary of Changes
- Contents
- Figures
- Tables
- Preface
- Safety
- Seguridad
- Hardware Installation
- Quick Installation Procedure
- Standard Installation Procedure
- Preparing for the Installation
- Unpacking the Library
- Inspecting the Library and Drives
- Preparing the Installation Location
- Positioning the Library
- Choosing SCSI HVD or LVD
- Installing the External Fibre Channel Router
- Connecting the External SCSI Cables
- Connecting Fiber and SCSI Cables
- Attaching the Personality Module
- Attaching the Cell Barrier Clip
- Inserting the Cartridges
- Drive Compatibility Issues
- Installing the Drives
- Powering-on the Library and Drives
- Recording the Configuration Information
- Locations, Specifications, and Cables
- SNMP
- Index
96053 Revision L 1-7
Standard Installation Procedure
10. Cut the tie wraps and remove the packing cushion from the Z shaft.
11. Carefully raise the Z carriage and remove the foam securing the hand assembly.
1. Outer Container
2. Container cap
3. Logo label, used for repacking
4. Container locks (Hold so the protruding part is
on top. Squeeze the ears and lift the locks to
secure them into the openings.)
5. Accessory container
6. Sleeve
7. Bar code label, used for repacking
8. Top cusion
9. Plastic bag
10. Library
11. Internal bracing items
12. Bottom cushion
13. Front and rear rail
14. Pallet
Figure 1-1. Unpacking the Library (L201_158)
1. Tie Wraps
2. Packing cushion around the rear Z shaft
3. Z carriage
4. Hand foam