User's Manual

10 Sun Fire X4150 Server Installation Guide May 2009
1. “Checking Compatibility” on page 10
2. “Disassembling Slide-Rails” on page 11
3. “Installing the Mounting-Brackets Onto the Server” on page 13
4. “Installing the Cable Management Arm” on page 19
5. “Verifying Operation of the Slide-rails and CMA” on page 26
6. “Connecting the Cables” on page 28
Rail Assemblies
The server might include either tool-less or bolt-on rail assemblies in rackmount kits.
Instructions for both types are included in this chapter.
Service Label
Refer to the service label on the Sun Fire X4150 server top cover for instructions on
how to install your server into a four-post rack, using the slide-rail and cable
management arm options. The service label includes instructions for both tool-less
and bolt-on rail assemblies.
Checking Compatibility
Check that your rack is compatible with the slide-rail and cable management arm
(CMA) options. The optional slide-rails are compatible with a wide range of
equipment racks that meet the following standards:
TABLE 2-1 Rack Compatibility
Item Requirement
Structure Four-post rack (mounting at both front and rear).
Two-post racks are not compatible.
Rack horizontal opening and unit
vertical pitch
Conforms to ANSI/EIA 310-D-1992 or IEC 60927
standards.
Distance between front and rear
mounting planes
Minimum 610 mm and Maximum 915 mm (24
inches to 36 inches).
Clearance depth in front of front
mounting plane
Distance to front cabinet door is at least 25.4 mm (1
inch).