Installation Guide

9. Carefully position the corner side panel tight against
the corner and firmly press the surface of the panel
against the walls. The corner side panel should not
extend all the way to the front edge of the bathtub.
10. Apply hand pressure up and down and side-to-side,
making sure all areas are in firm contact with the
wall. It is important to apply hand pressure to the
entire surface of the panel to bond it to the wall
surface.
11. Repeat Step 6 through Step 9 to install the
remaining corner-side panel.
Note: Make sure the top edge of both corner side
panels are at the same height measured from the tub
ledge.
Back Panel
1. Trial fit the back panel, and make any necessary
adjustments.
Fumes Hazard
The fumes from the silicone adhesive
and solvents used by the installer can
be harmful if used in an unventilated
room. Always work in a well-ventilated area. To keep the
area well-ventilated, open windows and use exhaust fans.
If adequate ventilation is not achievable or practical, use
respiratory protective equipment.
2. Clean the back of the panel with denatured alcohol.
WARNING
800-325-7008 21 The Swan Corporation
Installation Procedure