Installation Guide

TURF INSTALLATION
!
!
Unroll and cut turf in the client’s driveway or in a large open area. Slightly over- measure being
cautious so you are not left short on the job.
Before laying the turf, be sure the grain direction aligns with the original design.
Lay the turf in the desired area before you make any other cuts.
The final detail cuts are made after turf is nailed in place. Always cut turf from the back side.
Place cut turf on the completed base in install location.
Using 6” (60d) galvanized nails, nail one end of the turf section, tightly pulling other end in place. If
turf section is large, you can kick the turf forward using your feet, this helps tighten the turf into
place. Nail the other end into base. All turf edges should be secured with nails every 8” to 12”,
nailing through the turf and into the base. Be careful not to crimp the turf fibers under the nail
heads.
Perform final detail cuts and nail into base.
Note: If turf is being installed over concrete, a glue-down method may be used and no base is
required. Also note that it is highly recommended to have help carrying and moving custom cut
turf rolls due to the weight of the product.
!
Suggested tools: carpet knife
!
!
!
!
!
!
!
!
!