Installation Guide

TURF INSTALLATION AND SEAMING
!
With the turf sections side by side, make sure all of the rows are aligned in the same
direction.
Try to maintain equal spacing between the fiber rows.
Nail each side of the turf into the base, staggering the nails every 8”- 12” apart.
Use seam tape to connect the turf sections together. Use recommended adhesive
and spread with a trowel onto the seam cloth and carefully lay the turf over onto the
seam cloth. The seam will need time to dry or cure based on recommended curing
times by adhesive manufacturer. Adding weight like bags of sand on the seams helps
create a better bond.
Take your time on the seams. The more time and attention you give to details on the
seams, the better they will turn out.
Note: The seaming process can be tricky. Professional installers are trained to hide
seams so they are almost invisible. Please be aware that non-professional
installations could result in more visibility to the seams.
!
Suggested tools: trowel
!
!
!
!
!
!