User Manual

3 Installation Model 3300PB
3-8
Teledyne Analytical Instruments
3.5 Installation Checklist
Before connecting the instrument to the power source and turning it on,
make sure you have:
Correctly installed the Sample and Exhaust gas lines
Opened the isolation valves
Checked for leaks
Set the sample pressure to 5–10 psig (34.5-68.9 Kpa), nominal
(for non-vacuum service units)
Set the flow
Once the above checks have been made, you can connect to the power
source. The instrument is now ready for operation.