Installation Guide

Page 16
Installing CableRail by Feeney
®
for AZEK Rail
1”
Anchor posts should not
exceed 60 feet apart during
any continuous run of cable.
Optional - Protector Sleeves
are not required on the through
posts, but do offer a more
nished appearance.
Use a dab of adhesive on
Protector Sleeve if needed.
PRE-DRILL
THROUGH POST
SLEEVES
• For the through
posts, drill a 1/4”
hole through both
the Post and Post
Sleeve.
• Using the marks on
the Anchor Posts, drill
a through hole only in
the Post Sleeve with a
1/4” Bit drill.
PRE-DRILL
ANCHOR POST
SLEEVE
Leave about 1” of machine
thread exposed for cable
take-up.
DRIVE IN HANGER BOLTS
• On Anchor Posts, screw the Hanger Bolts
into the pilot holes in the Post with the
Hanger Bolt Installation Tool.
• Once Hanger Bolts are all driven in, then
screw on Quick-Connect Fittings.
3
1
2
Pre-drill 1/8”
into 4”x4”
Drill through
Post Sleeve
with 1/4” bit
1/4”
1/8”
Protective
Sleeve (X2)
1/4” 1/4”
Drill through
Post Sleeve
with 1/4” bit
Drill through
Post Sleeve
with 1/4” bit