Installation Guide

Page 17
Installing CableRail by Feeney
®
for AZEK Rail
ATTACH QUICK-CONNECT AND QUICK-CONNECT SWIVEL FITTINGS
Screw on Quick-Connect fi ttings snuggly against Post Sleeve onto one side
of the railing and lock nuts onto hanger bolts on the other side.
4
INSERT AND THREAD CABLE
5
CUT CABLE TO LENGTH
6
Screw on Quick-Connect Swivel fi tting onto the Hanger Bolt with the lock
nut already installed.
One side of the railing will be
only Quick-Connect fi ttings, the
other side will be Quick Connect
swivel fi ttings and lock nuts.
When all of the hardware is in place, insert one end of the
Cable into the Quick-Connect fi tting.
Feed the Cable through the Intermediate Baluster (or
through posts) with a lacing needle.
CUT CABLE TO LENGTH
Feed the Cable through the Intermediate Baluster (or
through posts) with a lacing needle.
Lacing Needle
Unscrew the Quick-Connect
swivel fi tting from the post to
measure length of cable
a
Trim Cable at the fi rst
cut line on Quick-
Connect Swivel Fittings
Insert Cable into
Quick-Connect
swivel fi ttings
b
c