Installation Guide

Page 5
Installing RadianceRail Express
®
System
5
6
INSTALL BOTTOM
RAIL
INSTALL BALUSTERS
AND TOP RAIL
Angled Sections: Place all but the two
end Balusters into the Bottom Rail. Pre-
drill Post Sleeve through the two Bracket
holes and attach with 1 5/8” screws.
Once attached to the Post, unscrew the
Top Rail from the Bracket at one end. Lift
the Top Rail slightly and insert the last
Baluster. Re-attach Top Rail and repeat
on other side.
Bottom Rail
Pre-drill 9/64”
#10 x 1 5/8” Screws
Installation Tips (Straight Section): Insert the 4th to last Baluster in the Top Rail and
rest it next to the Bottom Rail routed hole to elevate the Top Rail. Install the last 3
Balusters into the Top Rail first, followed by the Bottom Rail. Slide the Baluster that was
left out of the Bottom Rail into the routed hole, allowing the Top Rail to drop in place.
Straight Sections: Place one
baluster in routed hole at each
end of the Bottom Rail.
Place Top Rail and attach
Gasket and Bracket to one side.
Place the remaining Balusters in
the routed holes in the Bottom
Rail.