Instructions / Assembly

Support Brace
Assembly Instructions
Model #TD-30004 (Normal Duty), TD-30005 (Heavy Duty)
Tommy Docks
4003 Dixie Ave, Wausau, WI 54401
Phone : 715-842-3804
Toll Free : 866-675-1880
Fax : 715-842-3420
www.tommydocks.com
Components
Tools
Lower and Upper Clamp
Support Brace
½” Box
End Wrench
1
Assemble Lower Clamp Assembly onto Pipe Leg with Nut and Bolt provided (1a). Do not over tighten the Bolt
and Nut as the Clamp Assembly must fit loose on the Pip Leg to allow it to be lowered to its lowest position.
Assemble Upper Clamp Assembly onto the adjacent Pipe Leg with Nut and Bolt povided and tighten securely
(1b). The Upper Clamp Assembly should be located directly below the Pipe Leg Mounting Bracket as
referenced in the diagram. The tightened Upper Bracket will hold the Support Bracket securely in place.
1a 1b
Lower Clamp
Assembly
Upper Clamp
Assembly

Summary of content (1 pages)