TOOLS NEEDED
NOTE: Maximum spacing of deck boards using Hideaway
system is 16" (40.6 cm) on center. Fasteners provide 1/4"
(0.6 cm) gap when installed correctly.
Installing Start Clips and First Board
1. Install start clips on edge of ledger board, centered on
each joist. Secure clips with screws.
2. Push grooved edge of deck board into start clips.
Important: First board MUST be straight and well secured.
Installing Screws and Universal Fasteners
NOTE: If installing Trex Escape, proceed to Step 3. If
installing any other Trex decking product, proceed to Step 4.
3. At both ends and center of board, toenail screw (only for
Trex Escapes) at an angle through grooved edge of the
deck board.
4. Insert fastener into grooved edge of deck board.
5. Align screw hole in
fastener with center of
joist. Continue along the
length of the board at
every joist.
NOTE: Screw only half way
down. DO NOT fully tighten
universal fastener screws.
Installing Second Board
6. Slide second board
into place, making
sure fasteners fit into
groove. Install screws
and universal fasteners
on the other side of the
second board in the
same manner as Steps 3
through 5. DO NOT fully
tighten the screw of universal fastener.
Complete Universal
Fasteners Installation
7. Tighten screws on
fasteners in first row.
Proceed with Steps 3
through 6, tightening down
each row after board that
follows is in place. Be sure
to use a long #1 square bit.
Installing Last Board
Option 1:
Using Fascia Board
8a. Install 2-1/2" (6.4 cm)
screws through pilot
holes to secure. Attach
a fascia board flush with
deck surface.
Option 2:
With Deck Board Overhang
8b. Drill pilot holes at 4
angle from below deck
surface through rim
joist. Seat last board into
fasteners overhanging
rim joist. Secure board
with 2-1/2" (6.4 cm)
screws using pilot holes.
Position fascia board below overhanging deck board.