Installation Guide

O
F
F
O
F
F
O
FF
OFF
#2 Fan has completed its setting.
O
F
F
O
F
F
O
F
F
ON
(operating now)
7B.Turn on power at breaker box for remote setting.
OF
F
O
FF
O
F
F
ON
NOTE: For more than two fans, the same rules apply. Make sure only one fan at a time is connected to
power when doing the Remote Setting. Fans that have completed the setting process should be
disconnected until all fans have completed the Remote Setting process.
st
3. Turn off the power from main switch and install the AC Black wires to the 1 Fan which was previously
removed from step 1 (see step 1 in Pg.8) and secure with wire nut.
4. Turn on the power from the main switch. The two fans are now operated individually by its own remote.
P9
Outlet Box
Outlet Box
Mounting Bracket
#1 Fan
#2 Fan
Outlet Box
#2 Fan
Outlet Box
#1 Fan
(operating now)
SET
Press the button “SET” for 3-5 seconds till the fan starts reverse operation (clockwise).
Install battery cover on transmitter.
This fan is doing setting now and will do the following steps to complete its setting automatically.
Reverse operation (clockwise) for about 2.5 minutes
Stop
Forward operation (anti-clockwise) for about 2.5 minutes
Stop
Total 5 minutes for its setting, this fan has completed setting successfully!
IMPORTANT:
In event of no operating, do the following step for re-setting:
Switch off the main power and wait for 10 seconds, then switch
on the power again and do the above setting again.
7C. SETTING before starting fan