Install Guide & User's Manual
2
TRUE RESIDENTIAL
®
INSTALLATION CHECKLIST
To ensure a proper installation, this checklist should be completed to ensure that no part of the
process has been overlooked.
Have all packaging materials been removed?
Have the anti-tip brackets been installed securely and are they properly engaging the unit?
Is the unit leveled properly with all leveling legs making contact with the floor? Has the toe kick
been installed?
Has door stop been installed (if needed)?
Are panels attached securely and properly aligned? (Overlay cabinets only).
Does the customer understand the unit’s operation?
Has the customer been given the key and literature package?
Have stainless steel surfaces been inspected for any imperfections? This is to be done by the
authorized True dealer or installer with the customer, upon completion of installation. Stainless
steel doors, handles and shelves are covered by a limited 30-day warranty for cosmetic defects.
Is the unit operating properly? If not, is the unit plugged in? Is the control turned on?