Use and Care
............ www.truemfg.com ............
2020
True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
Required Tools:
• Slottedscrewdriver
• Needlenosepliers
• Hex-headnutdriver
Kit Components:
• HoseCleaningBrush
WARNING
Power must be disconnected before
beginning this procedure.
1. Removethecondimentpans.
2. Removetheshelvingfromtheunit.
3. Usingneedle-nosedpliersremove
therightorleftpilasterasneeded.(This
willprovideclearancetopullrightorleft
housingawayfromevaporator).
4. Usingahex-headnutremover,remove
rightorleftC-clampsasneededfromchiller
hose.(Removeclampsfrombothendsof
theassembly).
5. Backofffourslottedthumbscrewsand
removeevaporatorhousing.
IMPORTANT
Note the proper position of the flexible tubing
on top of evaporator. (See Fig. 6). Hose will
need to be repositioned in the same area to
ensure proper conditioned air circulation.
6. Gentlypullhousingfromtherightor
leftsideandworkforwardinordertoaccess
theflexiblehose.
CAUTION
Gloves are recommended to avoid contact
with possible sharp edges.
7. Routthebottlebrushthroughthe
rearoftheflexiblehoseandpushcontents
forward.
8. Reversetheproceduresasoutlined
above.
NOTE
Replace flexible hose in the original position
as indicated in Fig. 6. Failure to replace
properly will result in compromised unit
operation.
TSSU-27-12M-C CHILLER HOSE
1
4
5
7
6
2
3