Quick Start Guide

QUICK START GUIDE
u-line.com
22
Install top hinge and door:
1. 
install the pivot screw in the same hole from the
opposite surface.
2. Rotate door 180 degrees and position door onto
bottom hinge.
3. Align long edge of the hinge with the outer edge of the
unit.
4. Tighten three screws and replace hinge cover.
5. Replace hinge cover.
Align and adjust the door:
Align and adjust the door (see DOOR ALIGNMENT AND
ADJUSTMENT)
Top Hinge
Right Side
Top Hinge
Left Side
Pivot
Screw
1
Turn to Adjust
General Installation
LEVELING INFORMATION
1. Use a level to

level. Level should
be placed along top
edge and side edge
as shown.
2. If the unit is not
level, adjust the legs
on the corners of the unit as necessary.
3. 
repeat the previous steps as needed.
INSTALLATION TIP

opening, adjust the rear legs to achieve a total unit rear
height of ” (3 mm) less than opening’s rear height.
Shorten the unit height in the front by adjusting the front
legs. This allows the unit to be gently tipped into the
opening. Readjust the front legs to level the unit after it is
correctly positioned in the opening.
INSTALLATION
1. Plug in the power/electrical cord.
2. Gently push the unit into position. Be careful not
to entangle the cord or water and drain lines, if
applicable.
3. Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit’s top
surface should be approximately ” (3 mm) below the
countertop.
4. Install the anti-tip bracket.
5. Remove interior packing material and wipe out the
inside of the unit with a clean, water-dampened cloth.