Installation Guide

4
UPLAYTODAY PLAY SYSTEMS • 800.458.5872 • www.uplaytoday.com
MOUNTING OPTION 2 DETAIL
12"(305mm) Diameter
x 18”(457mm) Deep Holes
(4 ) Places
Shock absorbing material
12" [305mm]
18" [457mm]
Earth
Concrete
12" (305mm)
FOOTING DETAIL
Dimensioned
to top of brick
or equivalent
Brick or
equivalent
NOTE:
Hole depths indicated on all ground plans
are measured from the finished surface.
See Footing Details.
All Footer dimensions are based
on level finished surface.
NOTE:
Read all installation instructions thoroughly before starting.
Bracing material is required while concrete is curing.
Instructions:
1. Dig holes according to the Ground Plan above.
2. Place Crawl Tunnel into holes making sure posts rest on brick. See Footing Detail.
3. Level Crawl Tunnel.
4. Pour concrete according to Footing Detail. Allow 48 hours minimum for concrete to cure.
SPECIFICATIONS:
Crawl Tunnel: The 26” I.D. with 1/4” nominal wall thickness shall be rotationally molded linear
low density polyethylene.
Footer Post: Footer Post support shall be fabricated from 1.315”O.D., 14 gauge(.083” wall)
galvanized steel tubing and powder coated after fabrication.
Footer: 1” O.D. 14 gauge (.083” wall), galvanized, steel tubing welded to 1/4” thick
galvanized steel plate.
Hardware: Primary hardware is stainless steel.
Weight: 90 lbs.
Concrete Required :
Approx. .18 Cubic Yards (.14 Cubic Meters)
NOTE: Suggested Min. concrete rating: 3000PSI
45”(1143mm)
28”(711mm)
53”(1246mm)