Instructions / Assembly

Issued/Revised:
12/26/13
GENERAL INTRODUCTION TO INSTALLATION INSTRUCTIONS
uPLAY TODAY
800.458.5872
www.ultraplay.com
13
TOOLS REQUIRED:
UltraPlay supplies only the special wrenches and bits required to fasten the "tamper-resistant"
hardware and components. You will need common wrenches and an Allen key set as well as a drill,
string line, level, shovels, post hole digger, pry bar, washable felt tip marker, phillips head screw
driver, utility knife, rubber mallet, and a tape measure. A power post hole digger may facilitate
installation in some circumstances. Refer to the Tools Required page for a detailed list.
INSTALLATION GUIDELINES:
1. Compare all parts received to the packing list. Notify UltraPlay immediately of any missing parts.
We are not responsible for parts discovered missing over 10 days after receipt of the shipment.
2. Refer to the Use Zone to ensure this structure will fit into your actual site area. Note the Minimum
Area Required measurements to determine clear space required. A minimum of 72" clearance is
required between any obstacles and your structure. EXCEPT for slide exits, which require a
distiance X equal to the highest point of sliding surface with a minimum of 72" and a maximum of
96" from the edge of the slide (example: A Wave Slide from a 72" high deck requires 72" of clear
space with resilient surfacing in front of its exit).
3. Site selection should include considerations of what is a safe and appropriate play area:
-A level and clear site is ideal, free of power lines or electrical equipment.
-Do not install play equipment near any bodies of water.
-If adjacent to a street with traffic, ensure adequate fencing acts as a barrier to children running
into danger.
4. Site layout should include accurate measurement and marking of all footings prior to any
installation. Use the dimensions shown between footings on the Use Zone to plot out the actual
footprint of the play structure before doing any digging. Also locate any freestanding play
equipment in the same way, providing the necessary clearance between the equipment as well as
any fences, trees, etc. Ensure at this time you have enough total space for the equipment to be
installed.
5. If using inground footers, excavate holes as shown in the Use Zone using a string line. An optional
string line level is very helpful. If a level and clear site is not possible, adjust the depth of the
footings to maintain a minimum depth of 18" for support posts at the lowest grade. NOTE: If soil
conditions are very loose or otherwise unstable, a larger diameter footing may be required. Inquire
with local contractors for appropriate recommendations.
6. Begin your UPlayToday installation by erecting the decks as shown within the following instructions.
Once all decks are installed, components such as slides, climbers, etc., can be connected per their
respective assembly instructions. Note that connecting components between decks such as Crawl
Tunnels and Bone Bridges should be installed concurrently with the decks to ensure they are
accurate.