Instructions / Assembly

Issued/Revised:
05/07/13
BASS DRUM w/TUBE CLAMP 02-07-5023
uPLAY TODAY
800.458.5872
www.ultraplay.com
1
Parts List
PART NUMBER
QTYDESCRIPTION
02-07-00911BASS DRUM BRACKET
02-07-00392
TUBE CLAMP
02-07-00131
BASS DRUM
33-12-00211
33-11-0103*
6
M8 x 25mm (1") BHCS BOLT
33-11-0301*2
M8 LOCKWASHER
33-11-0500*
7
M8 LOCK NUT
33-11-0102*3M8 x 20mm (3/4") BHCS BOLT
33-11-0300*
6
M8 FLATWASHER
33-11-0700*2CLAMP RIVET
HARDWARE COMPLETE
Items listed below Hardware Complete line are included with Hardware Complete Number
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store
Unused Parts Appropriately Until Assembly Is Completed. Once Assembly Is Completed, Remove Any
Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location. Any bolt end
protruding more than two full threads beyond the face of the nut causes risk of clothing entanglement.
Promptly cut-off flush, file smooth, and treat to prevent corrosion.
Unless Otherwise Specified, All Units of Measure are Each
Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
INSTALLATION INSTRUCTIONS:
1. Choose the appropriate Upright to receive Bass Drum.
2. Insert Bass Drum Bracket into Tube Clamp and secure using M8 x 25mm B.H.C.S. Bolt and M8 Lock Washer. See Detail 029.
3. Attach Tube Clamp to Upright using M8 x 25mm B.H.C.S. Bolt and M8 Lock Nut. See Detail 030. (Do not install Clamp Rivet
until entire unit is assemblied.)
4. Attach Bass Drum to Bass Drum Bracket using M8 x 20mm B.H.C.S. Bolt, M8 Flat Washer, and M8 Lock Nut. See Detail 053.
NOTE:
PLACE TOP EDGE OF TOP CLAMP 26" FROM BOTTOM OF PAINTED UPRIGHT.
5. Plumb and level entire assembly before tightening all fasteners. Note: Apply Loctite to threads of Bolt to prevent from loosening.
MAINTENANCE PROCEDURE:
Periodically check hardware for tightness, and tighten as necessary. Always check all parts for breakage or wear, and immediately
put equipment out of service until any faulty parts found are repaired or replaced. Also Check all metal parts for rust, paint loss and
touch-up if necessary with paint. Check for welded areas and verify integrity. Check periodically resilient surfacing for appropriate
depth and remove extraneous materials that could cause injury, infection, or disease. Maintain detailed installation, inspection,
maintenance, and repair records for each public-use playground equipment.